Renovation of Kindergarten No. 9 “Ivasyk-Telesyk” in Kozyntsi

Renovation

Renovation of Kindergarten No. 9 “Ivasyk-Telesyk” in Kozyntsi

Project goal: Creating a safe and comfortable space for children by restoring the kindergarten premises
  • Project area:
    926 m²
  • Number of beneficiaries:
    60 children
  • Project partners:
    Kindergarten No. 9 “Ivasyk-Telesyk”, Irpin City Council
  • Budget Solidarity (planned):
    5 million
  • Budget Solidarity (actual):
    2.55 million*
  • Project end date:
    August 2025

*The actual cost was lower than anticipated thanks to efficient financial management, favorable terms from suppliers, and logistical support from a strategic partner.”

 

  • Project area:
    926 m²
  • Number of beneficiaries:
    60 children
  • Project partners:
    Kindergarten No. 9 “Ivasyk-Telesyk”, Irpin City Council
  • Budget Solidarity (planned):
    5 million
  • Budget Solidarity (actual):
    2.55 million*
  • Project end date:
    August 2025

*The actual cost was lower than anticipated thanks to efficient financial management, favorable terms from suppliers, and logistical support from a strategic partner.”

 

Context and Challenge

Kindergarten No. 9 “Ivasyk-Telesyk” in Kozyntsi village (Kyiv region) required renovation. The old roof structure, worn-out windows, and damaged plaster and roofing — caused by a recent nearby explosion — needed restoration to improve the building’s energy efficiency and ensure a comfortable environment for the young children.

Before
After
Before
After
Solidarity Contribution

The renovation of Kindergarten No. 9 “Ivasyk-Telesyk” was carried out in two stages.

Stage One: Roof Restoration
A new roof was installed, the wooden structures replaced, external insulation with mineral wool applied, and a drainage system added.
Our foundation provided all the necessary materials, including timber for the structures, metal roofing, components, mineral wool, and the drainage system. The building is now reliably protected from weather conditions and temperature fluctuations.

Stage Two: Facade and Windows
The walls were insulated, the facade was painted, and windows and some doors were replaced with PVC windows and doors. Window sills were installed, and the plastered slopes were painted.
The Solidarity Charitable Foundation provided all necessary materials—from mineral wool, plaster, and facade paint to PVC windows, doors, and window sills.

As a result, the kindergarten is now warmer, cozier, and more welcoming for the children.

Results and Impact

On September 1, 2025, Kindergarten No. 9 “Ivasyk-Telesyk” in Kozyntsi opened its doors to children with a fully restored roof and facades. The 926 m² building is now more comfortable and functional, serving 60 children out of a total capacity of 75.

💚 The team at the Solidarity Charitable Foundation is proud to have contributed to creating a safe, welcoming environment that supports the development and happy childhoods of the children.